Warning: Parameter 1 to modMainMenuHelper::buildXML() expected to be a reference, value given in
/home/mnsi.net/pwp/csieng2/public_html/libraries/joomla/cache/handler/callback.php on line
99
|
PROJECT / SYSTEMS DOCUMENTATION: At Con-Syst-Int Group Inc. we don't consider our projects complete until full documentation with all utilized product manuals are turned over to the customer. We deliver a hard and digital copy at the completion of each project to the satisfaction of our customers. Each project is documented in full in the following order: - Customer correspondence for design direction clarity
- Hardware prints (after review, release for build)
- Software development Controls and Operator Interface
- Interface screens reviewed with customer for functionality and level of Intuitivity
- Panel Build review
- Installation and wire
- Power On and complete I/O point for point verification
- Software system Commissioning
- Field markups are added to Drawings for accurate and complete as built drawing sets
- Customer Satisfaction
|
© 2010 Con-Syst-Int Group Inc. All rights reserved. Terms of Use and Disclaimer